Résumé
In 2013, the state-owned electrical energy utility in New Brunswick, Canada, announced that a problem with concrete expansion was shortening by 40 years the expected life of the 660 MW Mactaquac Generating Station on the Saint John River. Its construction late in the 1960s, and the subsequent inundation of 10,000 hectares (ha) was part of a regional modernisation programme. Locals lost homes, agricultural land, communities and landmarks and a new mill changed livelihoods and attracted new people. In the intervening decades, the reservoir has become locally cherished for waterfront living and pleasure boat recreation. Since 2012, independent social science research about the fate of the dam and headpond has been undertaken in parallel with stakeholder engagement and public relations by the electricity utility. The final decision was delivered late 2016. The chosen option was to extend the dam's life through repairs in situ, not one of the options formally under consideration. This paper presents provincial-scale discourses on the Mactaquac decision, using a 2014 energy survey of 500 New Brunswick residents which included questions about the Mactaquac decision. Analysis reveals how provincial preferences aligned with local qualitative research (summarised in an Appendix), revealing preferences for ongoing headpond amenity and the avoidance of further trauma associated with major landscape change. Preferences of First Nations to remove the dam may yet prove disruptive to the announced option. The discussion summarises aspects of the case study relevant to other instances of dam removal and landscape transition, as well as exploring options for further theoretical development, testing or application. These opportunities include: why males and females demonstrated different scales of concern around Mactaquac; the implications of different framings of hydroelectricity development (e.g. sacrificial landscape or local energy) on removal debates; and, how public decision-making can usefully engage with rather than dismiss uncertainty and path dependency.
Langue d'origine | English |
---|---|
Pages (de-à) | 697-723 |
Nombre de pages | 27 |
Journal | Water Alternatives |
Volume | 10 |
Numéro de publication | 3 |
Statut de publication | Published - 2017 |
Note bibliographique
Funding Information:This work was funded via a Social Sciences and Humanities Research Council of Canada (SSHRC) Insight Grant (435-2012-0636), 2012-2017, to John Parkins (PI), Beckley and Sherren. The researchers thank the residents of the Mactaquac Region, and elsewhere in New Brunswick, for their participation and insights. Feedback from Simon Mitchell, Christopher Sneddon and two anonymous reviewers on an earlier draft is appreciated. All the research herein was approved by ethics boards overseeing research involving humans at Dalhousie University, the University of New Brunswick and/or the University of Alberta. Sherren grew up in the Mactaquac headpond area, and Beckley and Comeau now live in the area, though they did not at the time of data collection. No support was received from parties involved in the Mactaquac Dam decision, but Comeau was a volunteer replacement member of the Community Advisory Committee of the NB Power Mactaquac process near its end.
ASJC Scopus Subject Areas
- Geography, Planning and Development
- Water Science and Technology
- Political Science and International Relations
- Management, Monitoring, Policy and Law